PEMODELAN PROSES BISNIS MANAJEMEN ASET MENGGUNAKAN TOGAF ARCHITECTURE DEVELOPMENT METHOD Studi Kasus: STMIK XYZ Surakarta

Authors

  • Sri Harjanto STMIK Sinar Nusantara Surakarta
  • Setiyowati Setiyowati STMIK Sinar Nusantara Surakarta

DOI:

https://doi.org/10.30646/sinus.v16i2.367

Keywords:

Asset Management, Business Process, TOGAF ADM, Business Process Reengineering, Business Process Modelling Notation

Abstract

STMIK XYZ is one of the universities in Surakarta. From the business process, there are some potential problems that interfere  the asset inventory process as one of the asset management functions. To knowing  some of the assets, its condition, and its position needs long time and also its data entry is less optimal. Purpose business architecture design and be able to integrate the main business activities using the TOGAF ADM framework. The existence of assets is a problem in the business process that runs on STMIK XYZ. It taken an architecture for the development of Information Systems, as well as the analysis and modeling of business processes so that the performance of institutions can realize the achievement of the objectives and it the improvement of business processes. This study uses Business Modeling Notation (BPMN) and TOGAF ADM methods to identify the needs and Business Process Reenginerin (BPR) in the development of information systems in households. The proposed  this study was to make an asset management plan using the TOGAF ADM method.

References

Brown, K., Laue, M., Keast, r., Mahmood, N.,Wiewiora, A., & Montagomery-Hribar, J.(2012). Pedoman Sistem Terpadu Pengelolaan Aset yang Strategis. Brisbane, Australia: Hanna Murphy.

Hammer, Michael, and Champy, James (1993), Reengineering the Corporation: A Manifesto for Business Revolution, Harper Business

Hidayat, M. (2012). Manajemen aset: Privat danPublik. Yogyakarta: LaksBang PRESSindo.

Kendall, K. K. (2013), System Analysis and Design. 8 ed. USA: Pearson Education. Upper Saddle River, New Jersey.

Astri, L., and Gaol, F. (2013). Information System Strategic Planning with Enterprise Architecture Planning. BINUS University, 7(msi.binus.ac.id), 23–27. Retrieved from http://msi.binus.ac.id/files/2014/03/05_Ford-Lumban-Gaol_OK.pdf

Object Management Group. 2011. Bussines Process Modelling and Notation (BPMN) . Needham: OMG.

T. O. G., (2016). The Open Group TOGAF 9.1. from The Open Group TOGAF 9.1, 19 Mei 2018,open.Website:http://pubs.opengroup.org/architecture/togaf9-doc/arch/index.html.

Downloads

Published

2018-08-20

How to Cite

Harjanto, S., & Setiyowati, S. (2018). PEMODELAN PROSES BISNIS MANAJEMEN ASET MENGGUNAKAN TOGAF ARCHITECTURE DEVELOPMENT METHOD Studi Kasus: STMIK XYZ Surakarta. Jurnal Ilmiah SINUS, 16(2). https://doi.org/10.30646/sinus.v16i2.367

Issue

Section

Articles

Similar Articles

> >> 

You may also start an advanced similarity search for this article.